Economic

Unloading Abundant Furnace in Sudan

Sudan Events – Nahid Oshi

From the 20th to 27th of this November, Port Al-Khair port, which is specialized in handling petroleum derivatives in Port Sudan, witnessed the unloading and departure of two furnace tankers with a total load of (78,598) tons, in addition to the unloading and departure of a cooking gas tanker with a load of (5,446) tons at Terminal (16) in the southern port. In Port Sudan, the weekly report of the Sea Ports Authority revealed that seven tankers were docked with various loads of petroleum derivatives, including benzene, gasoline, and cooking gas, in addition to the presence of a tanker for ethanol exports in the waiting area outside the port until the entry procedures to the port are completed.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button